GRADING
![IMG_4721](http://shapearch.com/wp-content/uploads/2016/04/IMG_4721-1024x768.jpg)
With the building pads compacted and set at the right elevations, the foundation outlines get chalked out for digging in a couple days.
![IMG_4755](http://shapearch.com/wp-content/uploads/2016/04/IMG_4755-768x1024.jpg)
We decided to do the perimeter site walls before digging the building footings while we have good access to this area.
![IMG_4810](http://shapearch.com/wp-content/uploads/2016/04/IMG_4810-768x1024.jpg)
We used Post Master fence posts and embedded them in the concrete curb to give us a strong fence anchor down the road. These things cost a bit more but make fence building much easier later on and add strength that won’t rot or be eaten by termites.